Aeonis Estimate › Estimate templates › Concrete

Concrete estimate template

A clear concrete estimate helps contractors win jobs by providing transparency and building trust with clients. It outlines the scope of work, materials, and costs, allowing clients to make informed decisions and avoiding potential disputes or misunderstandings. Below is a real, itemized sample you can copy, plus how to measure, what drives cost, and common mistakes.

Use this template freeGenerate one with AI

Sample concrete estimate

Job: Remove an old cracked driveway and pour a new 24x40 ft (960 sq ft) 4-inch reinforced concrete driveway with a broom finish, 4-inch gravel base, rebar, control joints and expansion joint at the garage.
Location: Columbus, OH · Finish level: Standard

Sample Contractor LLC
Columbus, OH
Estimate
Sample

Scope of work

The project involves removing the old cracked driveway and installing a new 24x40 ft reinforced concrete driveway with a broom finish. The total cost for the project is estimated to be around $23,455. The new driveway will have a 4-inch gravel base, rebar, control joints, and an expansion joint at the garage.

Line items

DescriptionQtyUnit priceAmount
Demolition
Remove old driveway960 sq ft$2.70$2,592.00
Materials
4-inch gravel base960 sq ft$1.80$1,728.00
Rebar (#3, 12-inch on center)200 lf$2.40$480.00
4-inch reinforced concrete960 sq ft$7.80$7,488.00
Labor
Concrete driveway installation crew64 hr$90.00$5,760.00
Materials
Control joints and expansion joint10 ea$60.00$600.00
Equipment
Concrete pump and finishing tools1 day$960.00$960.00
Permits and disposal
Permit fees and debris disposal1 ls$600.00$600.00
Total$20,208

Timeline

The project is expected to take around 3-5 days to complete, depending on weather conditions.

Assumptions

  • Existing driveway is accessible for removal
  • Soil conditions are suitable for new driveway installation

Exclusions

  • Landscaping or restoration of surrounding areas

Illustrative sample for a standard job in Columbus, OH, including a 20% markup. Prices vary widely by market, season, access and material choice, so always price from your own supplier quotes and labor rates.

How to measure a concrete job

Cubic yards = length × width × thickness (in feet) ÷ 27. A 4-inch slab is 0.333 ft, so 100 sq ft at 4 inches ≈ 1.23 yd³. Add 5–10% for over-excavation and waste. Add base material, reinforcement, forms and saw-cut or tooled joints as separate lines.

What every concrete estimate should include

What drives concrete cost

Materials
The cost of cement, aggregate, and other materials can significantly impact the overall estimate, as prices fluctuate based on location and availability.
Labor
Labor costs are a major driver, as concrete work requires skilled workers and can be labor-intensive, especially for complex or large-scale projects.
Equipment
The cost of renting or owning equipment, such as mixers, pumps, and finishing tools, can add up quickly, especially for large or specialized projects.
Site preparation
Site preparation, including excavation, grading, and demolition, can be a significant cost driver, as it requires specialized equipment and labor.
Permits and inspections
Obtaining necessary permits and passing inspections can add costs and delays to the project, especially if local regulations are complex or stringent.

Common concrete estimating mistakes

Write your next concrete estimate in about a minute

Describe the job and get itemized line items priced for your area, then brand it, mark it up and send a link your client can sign.

Create a free estimate

Free during early access · AI drafts to review, not quotes · No card

Concrete estimate FAQ

Should I include a pump or a short-load fee?

If the truck can't reach the pour or the order is under the plant's minimum, include a pump or short-load charge. These are easy to forget and come straight out of margin.

How should I handle removal of existing concrete?

Price demolition and haul-off per square foot at the existing thickness, and note an allowance if it turns out to be thicker or heavily reinforced, since disposal is often charged by weight.

What is the best way to estimate concrete quantities?

To estimate concrete quantities, contractors should use a combination of calculations and experience, taking into account the project's design, site conditions, and material specifications. It's also essential to consider factors like waste, spillage, and overage. By using a thorough and systematic approach, contractors can ensure accurate estimates and avoid costly mistakes.

How do I handle changes to the original estimate?

When handling changes to the original estimate, contractors should clearly document the changes, obtain client approval, and update the estimate accordingly. This includes providing a detailed breakdown of the additional costs and ensuring that the client understands the impact on the project timeline and budget.

What is the importance of including a warranty in the estimate?

Including a warranty in the estimate provides clients with peace of mind and protects contractors from potential liabilities. A clear warranty statement should outline the scope of coverage, duration, and any limitations or exclusions, giving clients a clear understanding of what to expect and helping to build trust in the contractor's work.

More estimate templates