Aeonis Estimate › Estimate templates › Roofing

Roofing estimate template

A clear roofing estimate helps contractors win jobs by providing homeowners with a thorough understanding of the work to be done and the costs involved. By including all necessary details, contractors can build trust with potential clients and demonstrate their professionalism. Below is a real, itemized sample you can copy, plus how to measure, what drives cost, and common mistakes.

Use this template freeGenerate one with AI

Sample roofing estimate

Job: Tear off and replace a 2,400 sq ft (24 squares) asphalt shingle roof on a single-story home, 6/12 pitch: replace 3 sheets of rotted decking, synthetic underlayment, ice & water shield at valleys, drip edge, ridge vent, 3 pipe boots, haul-off and permit.
Location: Tampa, FL · Finish level: Standard

Sample Contractor LLC
Tampa, FL
Estimate
Sample

Scope of work

The project involves tearing off and replacing a 2,400 sq ft asphalt shingle roof on a single-story home in Tampa, FL. The scope includes replacing 3 sheets of rotted decking, installing synthetic underlayment, ice & water shield, drip edge, ridge vent, and 3 pipe boots. The total cost for the project is estimated to be around $23,619.00.

Line items

DescriptionQtyUnit priceAmount
Materials
Asphalt shingles24 sq$102.00$2,448.00
Synthetic underlayment2400 sq ft$0.30$720.00
Ice & water shield300 sq ft$0.60$180.00
Drip edge400 lf$3.00$1,200.00
Ridge vent120 lf$4.80$576.00
Pipe boots3 ea$24.00$72.00
Labor
Tear off and replacement160 hr$72.00$11,520.00
Materials
Decking replacement3 ea$114.00$342.00
Disposal
Dumpster, haul-off & disposal1 ls$780.00$780.00
Permits
Roofing permit1 ea$360.00$360.00
Total$18,198

Timeline

5-7 working days

Assumptions

  • single-story home with accessible roof

Exclusions

  • interior repairs
  • additional decking replacement

Illustrative sample for a standard job in Tampa, FL, including a 20% markup. Prices vary widely by market, season, access and material choice, so always price from your own supplier quotes and labor rates.

How to measure a roofing job

Measure the footprint including overhangs, multiply by the pitch factor (6/12 ≈ 1.118, 8/12 ≈ 1.202, 12/12 ≈ 1.414) and divide by 100 to get squares. Add about 10% waste for a simple gable and 15% or more for hips and valleys. Measure eaves and rakes for drip edge, and the ridge length for ridge vent.

What every roofing estimate should include

What drives roofing cost

Materials
The cost of roofing materials, such as shingles, underlayment, and flashing, can vary depending on the type and quality chosen. This cost driver is critical to the overall estimate.
Labor
Labor costs are a significant factor in roofing estimates, as they depend on the number of workers, their level of expertise, and the time required to complete the job.
Permits and Inspections
Obtaining necessary permits and scheduling inspections can add to the overall cost of the project, and should be factored into the estimate.
Removal and Disposal
The cost of removing and disposing of old roofing materials can be substantial, and should be included in the estimate to avoid surprise costs.
Specialized Equipment
The use of specialized equipment, such as lifts or scaffolding, may be required for certain roofing jobs, and the cost of renting or owning this equipment should be factored into the estimate.

Common roofing estimating mistakes

Write your next roofing estimate in about a minute

Describe the job and get itemized line items priced for your area, then brand it, mark it up and send a link your client can sign.

Create a free estimate

Free during early access · AI drafts to review, not quotes · No card

Roofing estimate FAQ

How many bundles of shingles are in a square?

Most 3-tab and architectural shingles come 3 bundles per square (100 sq ft), but some heavier designer lines are 4 or 5. Always check the manufacturer's coverage per bundle before ordering.

Should decking replacement be priced up front?

List decking as a per-sheet unit price (e.g. 'replace rotted OSB, per 4x8 sheet') with an allowance for a few sheets. You can't see it until tear-off, and a unit price avoids a dispute when you find more.

What is the best way to determine the cost of materials?

The best way to determine the cost of materials is to get quotes from suppliers or manufacturers, and to factor in any discounts or promotions that may be available. It's also important to consider the quality and durability of the materials, as well as any warranties or guarantees that may be offered.

How do I calculate labor costs for a roofing job?

To calculate labor costs, you'll need to determine the number of workers required for the job, their level of expertise, and the time required to complete the work. You can then multiply the total number of hours worked by the hourly wage of each worker to get the total labor cost.

What is the importance of including a warranty and guarantee in the estimate?

Including a warranty and guarantee in the estimate provides assurance to the homeowner that the work will be done correctly and that any defects or issues will be addressed. This can help to build trust and increase the chances of winning the job.

More estimate templates